The Challenge
The Head Teacher of Ordsall Primary School contacted us with a view to installing an activity based playground into their school play area. She wanted something challenging with the flavour of true adventure for their pupils. But, it had to also be educational as learning is paramount across their curriculum.
The school as a whole required a full development plan which was to run for 5 years. They needed play areas for each year group with a progressive nature. Each pupil needs to grow and develop physically throughout their time at the school. This particular climbing tower system meets these needs perfectly. It allows for an unwavering amount of pupils to continually play in their play times.